![](https://www.rexbishopandson.co.uk/wp-content/uploads/2023/02/Asbestos-residue-removed-adopting-Eco-blast-Breathe-method-b.jpg)
![](https://www.rexbishopandson.co.uk/wp-content/uploads/2023/02/Machinery-removal.jpg)
![](https://www.rexbishopandson.co.uk/wp-content/uploads/2023/02/Boiler-room-before-works-start.jpg)
![](https://www.rexbishopandson.co.uk/wp-content/uploads/2023/02/Asbestos-residue-removed-adopting-Eco-blast-Breathe-method.jpg)
![](https://www.rexbishopandson.co.uk/wp-content/uploads/2023/02/Asbestos-residue-removed-adopting-Eco-blast-Breathe-method-c.jpg)
Asbestos
Don't hide it, remove it!
Location: Europa Industrial Park, Stratton St Margaret, Swindon, SN3 4ND
Project Manager: Neil Bishop / Jake Simpson
Duration: 6 weeks
Project Overview:
The project was to carry dismantle/remove a roof top water tank & redundant generator and boilers, then remove asbestos residue to walls behind paint adopting the eco blast & breathe method.
Scope of Work:
Dismantle roof top water tank & redundant generator and boilers.
Asbestos Removal.
Outcome: We had a HSE routine visit with a satisfactory result. The contract went smoothly and finished on time with the client signing the project off completed.