rex bishop animation
  • Demolition
  • Site Clearance
  • Demolition Site
  • Demolition
  • Demolition Slide 6
  • Demolition Slide 7

Demolition & Site Clearance

Our contribution to the construction industry over the past forty years has involved us in demolition and site clearance contracts throughout the country, ranging from large blocks of flats, factory buildings, hospitals, piers and domestic properties. Because of our professionalism and discretion we were awarded the demolition and site clearance of “25 Cromwell Street” by the local authority.

We do not consider any contract too big or too small to undertake and all enquiries are welcome.

  • Fully qualified demolition topman operatives
  • Registered waste carrier:  Licence no: CBDU186556
  • Fully insured
  • NEBOSH Qualified

We are particularly experienced in undertaking controlled demolition and soft-strip deconstruction projects in challenging environments. With one of the most experienced, multi-skilled workforces in the industry and access to high-performance specialist plant such as high-reach excavators and hydraulic platforms no project is beyond our scope.

We are committed to the recycling and reuse of recovered materials. We segregate potentially reclaimable, salvageable and recyclable materials metals, timber, glass, building materials, crushed concrete arising’s – to maximise their potential for re-use and value to you and minimise landfill.

Refurbishment/Demolition Survey

A Refurbishment and Demolition Survey is a legal requirement before any refurbishment or demolition work can be carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where the refurbishment work will take place or in the whole building if demolition is planned.

The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach. A refurbishment and demolition survey may also be required in other circumstances, e.g. when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling. These are to be carried out in unoccupied areas.

For more information on surveys, please click here.